Ok so here is the story...
Got my rates notice in the mail and appears that there is a change to the suburb we live in.
We were.... Lot1007 Gullinulla Place Glenmore Park NSW 2745 but are now 7 Gallinulla Place Mulgoa NSW 2745.
I called council this morning and they have confirmed it.... Our suburb is now MULGOA
That being said and seeing we are Mulgoa residents and not Glenmore Park residents I would love for Stockland to hurry up and open our new entrance from Bradley Street so I dont have to keep going through Glenmore Park to get to our block. Its annoying driving 1.6kms down the northern road, and then having to drive back when its closed....
Welcome to our building blog. We are building a modified St Thomas 30 with Fairmont Homes NSW
Pages
Friday, October 28, 2011
Wednesday, October 26, 2011
Handover 11/11/11
Well handover is supposed to be 10/11 or 11/11 depending on a few things.
There are final painting touch ups, shower screens, walk in robe, water tank, appliances, turf, external ceiling fan and a few other little things that need to be finished.
We can't wait but I am sure that the next 2 weeks is going to be the slowest that we have experienced.
Any no pics to update but things are looking good and will post some more pictures when we have something new to show.
There are final painting touch ups, shower screens, walk in robe, water tank, appliances, turf, external ceiling fan and a few other little things that need to be finished.
We can't wait but I am sure that the next 2 weeks is going to be the slowest that we have experienced.
Any no pics to update but things are looking good and will post some more pictures when we have something new to show.
Saturday, October 15, 2011
House Pictures
I have been meaning to take some photos for the past week or so and finally got around to it. Below is where we are up to so far.
Monday, October 10, 2011
Home Stretch...
Well things have been going to plan and thought I would post an update. Lots happened last week and we are hoping that the same happens this week.
We have been told that we should expect the following this week
We have been told that we should expect the following this week
- Front portico pillars will be rendered and painted
- Front driveway and path to be poured
- Wardrobes and showerscreens to be installed
- Tiling to be grouted
- Site cleared and levelled ready for topsoil and turf
- Concrete floor polishing finalised
After the above is done I think that all we have left to do is the following
- Install bath, toilets, mirrors and bathroom accessories
- Painting touchups
- Front entrance and kitchen splashback tiling
- Plumber and electrical final fitout
- Carpet
- Kitchen appliances
- Water Tank
- Blinds
- Ceiling fan in alresco
We can't be far away from keys now.....
Monday, October 3, 2011
Enter October
Well we are now starting the first week of October and things have been going along well.
We are pretty excited that we might get to see some cool stuff happening this week.
I think the tiler will be on site to do the bathrooms, laundry and kitchen splashback. We can't wait to see how they turn out when they are done.
If the tiler is there I would also expect the kitchen benchtops to be installed so he can do the splashback - fingers crossed.
I will post an update later in the week...
UPDATE: Kitchen Benchtops installed.... Bathrooms and Laundry tiling 50% done..... Painting 80% done.... internal doors hung/painted and handles installed.... Apparently they are going to cut the driveway and clear the site this week as well... cant wait...
Sucks being locked out thought! wish we could have a look inside!!
Looks like our Ivan is back to finish the floors so might be able to have a look over the weekend!!! Fingers crossed!!
We are pretty excited that we might get to see some cool stuff happening this week.
I think the tiler will be on site to do the bathrooms, laundry and kitchen splashback. We can't wait to see how they turn out when they are done.
If the tiler is there I would also expect the kitchen benchtops to be installed so he can do the splashback - fingers crossed.
I will post an update later in the week...
UPDATE: Kitchen Benchtops installed.... Bathrooms and Laundry tiling 50% done..... Painting 80% done.... internal doors hung/painted and handles installed.... Apparently they are going to cut the driveway and clear the site this week as well... cant wait...
Sucks being locked out thought! wish we could have a look inside!!
Looks like our Ivan is back to finish the floors so might be able to have a look over the weekend!!! Fingers crossed!!
Subscribe to:
Posts (Atom)